AWWA ACE91173 PDF

AWWA ACE91173 PDF

Name:
AWWA ACE91173 PDF

Published Date:
01/01/1991

Status:
Active

Description:

Integrated Layout of Treatment Plant Process Facilities

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
One of the last steps in the preliminary design of a water treatment plant (WTP) is to develop the plant layout. By this stage of the design process, the site has been selected, the treatment processes identified, and the approximate dimensions of the process units have normally been established. The engineer then faces the task of arranging the process units on the site. There are a number of alternative basic plant layouts. The particular plant layout selected can have a significant impact on construction cost, hydraulics, plant performance, operation and maintenance (O&M), and ease of expansion. This paper describes a compact water treatment plant layout which has been found to simplify O&M activities and minimize construction cost.
File Size : 1 file
ISBN(s) : 0898675928
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 24
Published : 01/01/1991

History


Related products

AWWA ACE91219
Published Date: 01/01/1991
Package Plants for Small Water Supplies: Their Role in Systems Expansion
$7.2
AWWA ACE91218
Published Date: 01/01/1991
How to Select a Consulting Engineer
$7.2
AWWA ACE91204
Published Date: 01/01/1991
State Programs Incorporating Water Conservation
$7.2
AWWA ACE91198
Published Date: 01/01/1991
Filtration Operation and Maintenance for Small Systems
$7.2

Best-Selling Products

CSAO RM001
Published Date: 01/01/2001
Rigging Manual
$19.8