AWWA ACE92123 PDF

AWWA ACE92123 PDF

Name:
AWWA ACE92123 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Particle Size in Filtration: Dynamics of Ripening, Breakthrough, and Breakoff

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The research described in this paper was designed to obtain detailed information on ripening and breakthrough in carefully controlled experiments using natural heterodisperse suspensions. Special emphasis was placed on understanding the effect of particle size on these phenomena. Specifically, experiments were conducted to investigate the effect of particle concentration and the role of particle reentrainment (i.e., breakoff) in ripening and breakthrough under various operating conditions.
File Size : 1 file
ISBN(s) : 0898676517
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 01/01/1992

History


Related products

AWWA ACE92135
Published Date: 01/01/1992
Use of In-Line Ozone and Hydrogen Peroxide for Organic Chemical Removal
$7.2
AWWA ACE92134
Published Date: 01/01/1992
Control of Disinfection Byproducts and AOC by Pre-Ozonation and Biologically-Active In-Line Direct Filtration
$7.2
AWWA ACE92129
Published Date: 01/01/1992
Reactions Between Soluble Iron, Dissolved Organic Carbon, and Alternative Oxidants During Conventional Water Treatment
$7.2
AWWA ACE92128
Published Date: 01/01/1992
Reactions of Ozonation Byproducts With Chlorine and Chloramines
$7.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138