AWWA ACE92152 PDF

AWWA ACE92152 PDF

Name:
AWWA ACE92152 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Operational and Water Quality Problems Associated With CT Compliance

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Planning for the implementation of disinfection requirements at the South Central Connecticut Regional WaterAuthority's (RWA) three treatment facilities has been an interesting if not frustrating case study. The Lake Saltonstall Water Treatment Plant (WTP) proved to be the easiest facility to bring into compliance by simply elevating the prechlorine dose. The West River WTP was somewhat more challenging as the existing filtered water reservoirs (FWRs) needed to be modified to enhance their hydraulic flow characteristics. Installing a single vertical baffle wall in both FWRs was sufficient to provide the required level of disinfection. The Lake Gaillard WTP was the most challenging facility in terms of upgrading disinfection. Attempts to introduce several variations of prechlorination have resulted in a myriad of physical and chemical problems. Additionally, the elevated levels of THMs resulting from this process change are still being evaluated.
File Size : 1 file
ISBN(s) : 0898676525
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 01/01/1992

History


Related products

AWWA ACE92176
Published Date: 01/01/1992
Low-Cost High-Tech Tracer Studies for SWTR Compliance
$7.2
AWWA ACE92169
Published Date: 01/01/1992
Corrosion Control of Finished Water From a Membrane Process
$7.2
AWWA ACE92167
Published Date: 01/01/1992
Phase II and Phase V Regulations: Cost Reduction Through GC/MS Method Consolidation and Phase Integration
$7.2
AWWA ACE92165
Published Date: 01/01/1992
Polyaluminum Hydroxychloride Coagulants Reduce Finished Water Aluminum Residuals
$7.2

Best-Selling Products

EEMUA /EI Publication 241
Published Date: 06/01/2019
Guidance on the Presence and Operation of Portable Self Energised Electrical/Electronic Devices in Potentially Explosive Atmospheres (Gas and Dust)
$63
EEMUA Publication 133
Published Date: 05/01/2011
Specification for Underground Armoured Cable Protected against Solvent Penetration and Corrosive Attack, Revised 2015
$25.146
EEMUA Publication 138
Published Date: 01/01/2010
Design and Installation of On-Line Analyze Systems, Revised 2015
$83.439
EEMUA Publication 140
Published Date: 11/01/2014
Noise Procedure Specification, Revised 2015
$32.004
EEMUA Publication 141
Published Date: 11/01/2014
Guide to the Use of Noise Procedure Specification, Revised 2015
$30.48
EEMUA Publication 149
Published Date: 01/01/1997
Code of Practice for the Identification and Checking of Materials of Construction in Pressure Systems in Process Plants, Revised 2015
$34.671