AWWA ACE92173 PDF

AWWA ACE92173 PDF

Name:
AWWA ACE92173 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Filtration Studies for Greater Vancouver's Water Supply

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In August 1991, predesign for Phase 1 of the Water Quality Improvement Plant (WQIP) adopted by the Greater Vancouver Water District (GVWD) including upgraded disinfection and corrosion control facilities and upgrading of facilities to transfer high quality Coquitlam water in a westerly direction, and planning studies for Phases 2 and 3, filtration and Seymour and Capilano, respectively, were initiated. The planning studies include pilot filtration plant studies at Capilano and Seymour in order to develop conceptual process design criteria for the proposed 900 ML/day filtration plants. It is important to note that the pilot plant studies are not being used to develop detail design criteria but as a tool to facilitate the planning required, at this time, for phases 2 and 3 of the WQIP. This paper describes the pilot plant studies under way, the pilot plant equipment and procedures, and some preliminary results.
File Size : 1 file
ISBN(s) : 0898676525
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 34
Published : 01/01/1992

History


Related products

AWWA ACE92174
Published Date: 01/01/1992
Demonstration of the Composite Correction Program Approach to Optimize Small Water Treatment Plant Performance in the United States
$7.2
AWWA ACE92172
Published Date: 01/01/1992
Evaluation of Corrosion Control Alternatives for Low pH, Low Alkalinity Surface Waters in Eastern Massachusetts
$7.2
AWWA ACE92164
Published Date: 01/01/1992
Advances in the Bicarbonate Method of Internal Corrosion Control
$7.2
AWWA ACE92163
Published Date: 01/01/1992
Bench-Scale Evaluation of the Impact of Ozonation and Coagulation on Disinfection By-Product Formation in Eighteen Waters
$7.2

Best-Selling Products

PCI 126-15
Published Date: 2015
Manual for the Design of Hollow Core Slabs and Walls
Free Download
PCI 128-19
Published Date: 2019
Specification for Glass-Fiber-Reinforced Concrete Panels
$39.6
PCI 142-24
Published Date: 2024
Specification for Precast, Prestressed Concrete Piles
$39.6
PCI 150-24
Published Date: 2024
Specification for the Design of Precast Concrete Insulated Wall Panels
$39.6
PCI BM-20
Published Date: 2004
Precast Prestressed Concrete Piles - Chapter 20, Bridge Design Manual, Sept. 2004, 1st Edition
$3.3
PCI CB-02-16
Published Date: 2016
Recommended Practice for Lateral Stability of Precast, Prestressed Concrete Bridge Girders
$36.3