AWWA ACE92196 PDF

AWWA ACE92196 PDF

Name:
AWWA ACE92196 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Marco Island R.O. Plant Overcoming Regulatory and Construction Obstacles A Case Study

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Initially, the Marco Island brackish water reverse osmosis plant construction project was planned to be completed on a fast-track basis to satisfy certain regulatory and quality of service requirements. These included: improve system operating pressures; increase capacity to provide service for present and anticipated customers; improve the reliability of the present water supply and treatment facilities; bring the facility online, concurrent with other major improvements, to meet expected system deficiencies and to avoid numerous rate filings and any unnecessary delay in recovery of rates. These objectives were hindered by rapidly developing, unpredictable factors which include: changing county and state permitting requirements; intervention by special interest groups; manufacturers-patent law suit and long lead time required on specialty equipment orders; soil and geological anomalies; contractors and sub-contractors; and project control. The objectives of presenting this case study are to increase the awareness of possible pitfalls and suggest ways to minimize the delays and increased project costs that were experienced during the Marco Island project.
File Size : 1 file
ISBN(s) : 0898676533
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/1992

History


Related products

AWWA ACE92241
Published Date: 01/01/1992
Automation Expectations and Reality
$7.2
AWWA ACE92218
Published Date: 01/01/1992
The QuikValve Valve Insertion Method
$7.2
AWWA ACE92217
Published Date: 01/01/1992
Water Supply and Treatment Facilities Expansion City of St. Cloud, Minnesota
$7.2
AWWA ACE92214
Published Date: 01/01/1992
Plant Modernization and Rehabilitation Alvarado Water Treatment Plant
$7.2

Best-Selling Products

ADS A62403-432
Published Date:
Assembly of Clamp, Loop Style, Box Cushion
ADS AGS1000
Published Date: 07/13/1960
Clip - Hose, Type 'S'. General Arrangement
ADS AGS1001
Published Date: 08/30/1938
R.A.E. Petrol Filter (200 G.P.H. Shallow Sump Type)
ADS AGS1002
Published Date: 08/20/1938
R.A.E. Petrol Filter
ADS AGS100
Published Date: 07/01/1977
AGS Design Notes
ADS AGS1010
Published Date: 12/03/2015
Standard Compressed Air Bottle Assemblies