AWWA ACE93048 PDF

AWWA ACE93048 PDF

Name:
AWWA ACE93048 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Compliance With the Lead Copper Rule

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The main topics covered in this paper include the material survey, sampling plan, sample collection, and results interpretation. In addition, the paper includes an outline of the steps required when either of the action levels are exceeded at any stage of sampling.
File Size : 1 file
ISBN(s) : 0898677114
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 01/01/1993

History


Related products

AWWA ACE93054
Published Date: 01/01/1993
Drinking Water Vulnerability Assessments in Texas
$7.2
AWWA ACE93052
Published Date: 01/01/1993
Towards Equity in Sharing the Cost of Bulk Water Infrastructure Capacity Expansion
$7.2
AWWA ACE93049
Published Date: 01/01/1993
Strategies to Enhance Water Utilities' Credit-Worthiness Through Risk Management
$7.2
AWWA ACE93043
Published Date: 01/01/1993
Privatization of America's Water Infrastructure - A Century of Progress
$7.2

Best-Selling Products

2019 IADC Membership Directory
Published Date: 2019
$22.5
2020 IADC Membership Directory
Published Date: 2020
$22.5
2021 IADC Membership Directory
Published Date: 2021
$22.5
2022 IADC Membership Directory
Published Date: 2022
$22.5
2023 IADC Membership Directory
Published Date: 2023
$22.5
2024 IADC Membership Directory
Published Date: 2024
$22.5