AWWA ACE93160 PDF

AWWA ACE93160 PDF

Name:
AWWA ACE93160 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Lessons Learned from Wellhead Treatment DBCP Treatment in California

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In 1989, the adoption of a more stringent maximum contaminant level for dibromochloropropane (DBCP) suddenly put many wells operated by California drinking water utilities out of compliance. This case study describes the technical aspects of several utilities' response. Granular activated carbon filters were used to treat the groundwater. GAC pressure filters may be operated in series or parallel; each configuration has advantages and disadvantages. Fifteen of the eighteen treatment units installed in California use the parallel layout. The carbon vessels typically contain 20,000 pounds of carbon and measure 10 to 12 feet in diameter. Most were installed with no advance pilot testing. Most of the units were constructed without competitive bidding. The total cost for a 1,500 gpm well varies from $230,000 to $250,000. Two to three months was needed to fabricate the vessels, and a month required for installation and start up. Headloss is considerably less than anticipated, ranging from 2-5 psi. The need for backwashing is also less than anticipated; some units have run three years without backwashing. While little of the carbon has needed to be replaced, the spent carbon that has been produced was declared nonhazardous. The treatment units are equipped with rupture disks; however, one water company experienced several ruptures that resulted in the loss of water. Bacterial growth in the vessels is a potential problem; some utilities disinfection, others don't. One utility is conducting tests to evaluate the performance of different types of carbon and flow rates.
File Size : 1 file
ISBN(s) : 0898677149
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1993

History


Related products

AWWA ACE93183
Published Date: 01/01/1993
Particle Counting for Evaluating Treatment of Low-Turbidity Waters
$7.2
AWWA ACE93178
Published Date: 01/01/1993
Fusion Bonded Epoxy for Flow Efficiency and Corrosion Protection of Steel and Ductile Iron Pipe
$7.2
AWWA ACE93172
Published Date: 01/01/1993
Solving a Coliform Outbreak in a System Using Groundwater Without Disinfection
$7.2
AWWA ACE93167
Published Date: 01/01/1993
Colloidal Sulfur Turbidity Control and Offgas Treatment
$7.2

Best-Selling Products

ESD ADV1.0-2009
Published Date: 09/14/2009
Glossary of Terms
ESD ADV1.0-2014
Published Date: 05/09/2014
Glossary of Terms
ESD ADV1.0-2017
Published Date: 01/31/2017
Glossary of Terms
$6
ESD ADV1.0-2024
Published Date: 05/06/2024
Glossary of Terms
$6.9
ESD ADV11.2-1995
Published Date: 09/10/1995
Protection of Electrostatic Discharge Susceptible Items - Triboelectric Charge Accumulation Testing
$45
ESD ADV53.1-1995
Published Date: 1995
ESD Protective Workstations