AWWA ACE93169 PDF

AWWA ACE93169 PDF

Name:
AWWA ACE93169 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Arsenic Removal by Anionic Exchange

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-ace93169_230739

Choose Document Language:
7.20 €
Need Help?
The US Environmental Protection Agency (USEPA) is considering revising the existing maximum contaminant level (MCL) of 0.05 mg/l of arsenic in drinking water. The ion exchange process was evaluated as a potential candidate to remove arsenate ion to a level of 0.002 mg/l. Four pilot-scale columns were run in parallel using a strong base anion (SBA) exchange resin for the evaluation. Chromatographic peaking and concentration gradient phenomenon were observed to occur during the course of the study. Raw water and regenerant solution characteristics were evaluated as a measure of the amount of ion selectivity that occurred. Three regeneration procedures were tested to determine their effect on the ability to restore resin capacity. The pilot-scale results of the continuous flow tests were compared to the results obtained from several full-scale installations. These studies demonstrated the ability of the SBA resin to remove arsenic to the 0.002 mg/l target value.
File Size : 1 file
ISBN(s) : 0898677149
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 21
Published : 01/01/1993

History


Related products

AWWA ACE93191
Published Date: 01/01/1993
Demonstration-Scale Evaluation of Bromate Formation and Control Strategies
7.20 €
AWWA ACE93186
Published Date: 01/01/1993
A New Hydraulic Flocculation Process for Water Treatment
7.20 €
AWWA ACE93177
Published Date: 01/01/1993
Recent Advances in Pulsed Sludge Blanket Clarifiers
7.20 €
AWWA ACE93175
Published Date: 01/01/1993
Intelligent, Automatic Coagulant Control for Water Treatment Based on Chemical Parameters
7.20 €

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990