AWWA ACE93235 PDF

AWWA ACE93235 PDF

Name:
AWWA ACE93235 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Maintaining Automated Plant Operation During a Plant Expansion

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
A 3.0 million gallon per day expansion was designed for an existing 4.0 mgd reverse osmosis, membrane softening water treatment plant. This paper describes both the existing plant control system and the newly designed control system and the design criteria for the modifications. Sequencing of new construction, modification of the existing facilities, and modification of the existing control system are discussed. The considerations for operating a reverse osmosis treatment process are also discussed. The project combined a plant expansion with a process control system upgrade and expansion.
File Size : 1 file
ISBN(s) : 0898677157
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 01/01/1993

History


Related products

AWWA ACE93233
Published Date: 01/01/1993
Anticipating and Dealing with Supplied Product Deficiencies in Distribution Systems
$7.2
AWWA ACE93222
Published Date: 01/01/1993
Contending With Filter Media Problems
$7.2
AWWA ACE93219
Published Date: 01/01/1993
Certa-Lok VIP Restrained Joint PVC Municipal Pipe
$7.2
AWWA ACE93209
Published Date: 01/01/1993
Quality Improvements in the Design Process
$7.2

Best-Selling Products

Physical Chemistry
Published Date: 08/01/2000
$11.4