AWWA ACE93247 PDF

AWWA ACE93247 PDF

Name:
AWWA ACE93247 PDF

Published Date:
01/01/1993

Status:
Active

Description:

A New Water Plant for a New Supply at Tucson, Arizona

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Through careful study of energy alternatives and creative design Tucson has the option to determine the best pump drivers and negotiate the most favorable energy rates for their raw water pump station. Pilot testing and flexible plant design can optimize the process for the water and provide the required horsepower to handle unusual situations. The control system can increase operator efficiency and allow the process to be refined and controlled by minimal staff.
File Size : 1 file
ISBN(s) : 0898677157
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 01/01/1993

History


Related products

AWWA ACE93248
Published Date: 01/01/1993
Modesto Domestic Water Project: A New Surface Water System Designed For Compatibility With Existing Groundwater Supply
$7.2
AWWA ACE93240
Published Date: 01/01/1993
Committee Report: Water Accountability
$7.2
AWWA ACE93239
Published Date: 01/01/1993
New Developments in Slow Sand Filtration
$7.2
AWWA ACE93237
Published Date: 01/01/1993
PLCs Help Quench City of Milpitas' Thirst
$7.2

Best-Selling Products