AWWA ACE95139 PDF

AWWA ACE95139 PDF

Name:
AWWA ACE95139 PDF

Published Date:
01/01/1995

Status:
Active

Description:

Conversion From Gravity to Pressurized Flow: The 60 MGD Puddletown Booster Station

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
During prolonged dry periods, the level in the Nepaug reservoir cannot be maintained due to hydraulic limitations of the gravity flow 48 inch pipeline. Therefore, the Metropolitan District Commission (MDC) had planned to construct an additional gravity flow pipeline to augment the existing 48 inch line. However, due to the large construction costs associated with this project, MDC began to investigate other alternatives. Upon analyzing potential solutions, one promising alternative warranted indepth investigations. This alternative would allow the gravity flow regime to be maintained during normal demand and rainfall periods, and a new pumping station could provide additional capacity during high demand and low rainfall periods. This paper describes the elements of the MDC hydraulic evaluation (model selection and development), calibration, hydraulic criteria, system curves, and pipeline pressure rating. To better quantify the likely operating transient pressures, a computerized transient analysis was completed using the Surge 4 proprietary software developed by the University of Kentucky. This analysis evaluated: normal startup, normal shutdown, and emergency shutdown. Several design considerations (mechanical, visual aesthetics, noise control, and system control) were considered during the analysis. Furthermore, system startup procedures were examined. The paper concludes with several reasons for the successful research and the cost-effectiveness of the pumping station alternative.
File Size : 1 file
ISBN(s) : 0898678358
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 01/01/1995

History


Related products

AWWA ACE95152
Published Date: 01/01/1995
Linking SCADA With Network Simulation
$7.2
AWWA ACE95132
Published Date: 01/01/1995
CT Reservoir Design Guide and Trace Study Results
$7.2
AWWA ACE95131
Published Date: 01/01/1995
Managing Your Consulting Engineer
$7.2
AWWA ACE95129
Published Date: 01/01/1995
Utilization of Membrane Technology for Small System SDWA Compliance
$7.2

Best-Selling Products

SN-ISO/TS 10993-19:2006
Published Date: 07/01/2014
Biological evaluation of medical devices — Part 19: Physico-chemical, morphological and topographical characterization of materials
SN-ISO/TS 10993-19:2020
Published Date: 12/14/2020
Biological evaluation of medical devices — Part 19: Physico-chemical, morphological and topographical characterization of materials
SN-ISO/TS 10993-20:2006
Published Date: 07/01/2014
Biological evaluation of medical devices — Part 20: Principles and methods for immunotoxicology testing of medical devices
SN-ISO/TS 14067:2013
Published Date: 07/01/2013
Greenhouse gases — Carbon footprint of products — Requirements and guidelines for quantification and communication
SN-ISO/TS 14092:2020
Published Date: 09/02/2021
Adaptation to climate change - Requirements and guidance on adaptation planning for local governments and communities
SN-ISO/TS 14812:2022
Published Date: 09/20/2023
Intelligent transport systems - Vocabulary