AWWA ACE95289 PDF

AWWA ACE95289 PDF

Name:
AWWA ACE95289 PDF

Published Date:
01/01/1995

Status:
Active

Description:

Chlorine Dioxide Regeneration in Distribution Systems

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The objectives of the research presented in this paper were: determine which pH and temperature conditions favor chlorine dioxide regeneration; achieve a better understanding of the mechanisms which cause chlorine dioxide regeneration in distribution systems; and develop methods of controlling chlorine dioxide regeneration, while still maintaining a free chlorine residual when desired.
File Size : 1 file
ISBN(s) : 089867834X
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 33
Published : 01/01/1995

History


Related products

AWWA ACE95297
Published Date: 01/01/1995
Membrane Filtration for Backwash Water Recycle
$7.2
AWWA ACE95283
Published Date: 01/01/1995
Establishing NPDES Limitations for Residuals From Three Phoenix Water Treatment Plants
$7.2
AWWA ACE95276
Published Date: 01/01/1995
Cannon Beach, Oregon Chooses Slow Sand Filtration for SWTR Compliance
$7.2
AWWA ACE95274
Published Date: 01/01/1995
Cost and Performance Evaluations of Alternative Filtration Technologies for Small Communities
$7.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1