AWWA ACE99320 PDF

AWWA ACE99320 PDF

Name:
AWWA ACE99320 PDF

Published Date:
01/01/1999

Status:
Active

Description:

"Design/Build/Maintain Project Delivery Minimizes Risks While Ensuring Quality for Detroit's New 240-MGD Water Treatment Plant"

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper discusses a construction project that involved building a new 240 mgd water treatment plant (WTP) at Detroit Water and Sewerage Department's (DWSD) Water Works Park site. The new plant would lower operating and maintenance costs, have a longer useful life, and allow DWSD to comply with anticipated more stringent water quality regulations. DWSD recognized that a Design/Build approach would encourage innovation and would significantly shorten the project delivery schedule for the new WTP, reducing the amount of time the existing plant would need to be kept operational. To ensure that the Design/Builder provided a low maintenance, high quality plant, it was decided to make the contractor responsible for all maintenance for the first seven years of plant operation. In December 1996, a 6-month pilot study was started to establish the Basis of Design for the new WTP. During the pilot study, the requirements for the project and the Design/Build/Maintain contractor selection procedure were determined. Further contractural terms are discussed.
File Size : 1 file , 180 KB
ISBN(s) : 1583210016
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 15
Published : 01/01/1999

History


Related products

AWWA ACE99329
Published Date: 01/01/1999
What's Available in AMR Technologies
$7.2
AWWA ACE99365
Published Date: 01/01/1999
Rehabilitation of Distribution Mains With Polyester Reinforced Polyethylene (PRP)
$7.2
AWWA ACE99374
Published Date: 01/01/1999
Alexis WTP Upgrade Project (SCADA - When You Can't Be Two Places at Once)
$7.2
AWWA ACE99456
Published Date: 01/01/1999
Modeling Chlorine and DBPs in Distribution Systems: A Mechanistic Approach
$7.2

Best-Selling Products

SN-ISO/IEC Guide 14:2018
Published Date: 07/13/2018
Products and related services — Information for consumers
SN-ISO/IEC Guide 41:2018
Published Date: 11/01/2018
Packaging — Recommendations for addressing consumer needs
SN-ISO/IEC Guide 71:2001
Published Date: 11/20/2002
Guidelines for standards developers to address the needs of older persons and persons with disabilities
SN-ISO/IEC Guide 73:2002
Published Date: 05/01/2006
Risk management — Vocabulary — Guidelines for use in standards
SN-ISO/IEC Guide 76:2008
Published Date: 01/16/2008
Development of service standards — Recommendations for addressing consumer issues
SN-ISO/IEC Guide 98-6:2021
Published Date: 03/22/2021
Uncertainty of measurement — Part 6: Developing and using measurement models