AWWA ACE99381 PDF

AWWA ACE99381 PDF

Name:
AWWA ACE99381 PDF

Published Date:
01/01/1999

Status:
Active

Description:

City of San Diego Mid-City Pipeline Project Integrating a Public Outreach Program into the Planning and Alignment Selection Process

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Obtaining public acceptance and support for construction of a major pipeline through a developed urban community can present more difficult challenges than the actual engineering elements of the project. Today, with the increasing public desire for a say about projects which impact their communities, obtaining public acceptance can be one of the most challenging aspects of urban pipline design. The days of "decide, design and defend" are gone, replaced by a process of community involvement in the design process. The City of San Diego's Mid-City pipeline is an excellent example of bringing the community of a highly urbanized area in to active involvement with the engineers to achieve common goals. Achieving public support requires a commitment by both the designers and project owners to spend the time and resources to integrate the public into the decision making processes.
File Size : 1 file , 150 KB
ISBN(s) : 1583210016
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 01/01/1999

History


Related products

AWWA ACE99305
Published Date: 01/01/1999
Preparing for the Consequences of Practicing Enhanced Coagulation and Delayed Chlorination
$7.2
AWWA ACE99349
Published Date: 01/01/1999
Electrodialysis Reversal at the City of Sherman
$7.2
AWWA ACE99369
Published Date: 01/01/1999
National Academy of Science/National Research Council Report on Health Risks From Arsenic
$7.2
AWWA ACE99486
Published Date: 01/01/1999
A Regional Water Conservation Program in the Water Rich Midwest
$7.2

Best-Selling Products

NEMA/MITA CSP 2-2021
Published Date: 2021
Lifecycle Best Practices Framework for Medical Imaging Devices
$14.7
NEMA/MITA DD P1-2019
Published Date: 08/01/2019
White Paper on Understanding the Limited Usefulness of Detector Dose Measurements in Modern Medical X-ray Imaging Equipment
$24.6
NEMA/MITA RMD P1-2019
Published Date: 01/30/2019
White Paper on Considerations for Remanufacturing of Medical Imaging Devices
$14.7
NEMA/MITA RSSTCD 1-2019
Published Date: 2019
White Paper on Radiation Safety Specification and Testing Comparison Document for Medical X-Ray Imaging Devices General Radiography and Fluoroscopy, and Interventional Fluoroscopy
$28.8
NEMA/MITA RSSTCD 2-2020
Published Date: 2020
White Paper on 21 CFR Subchapter J to IEC Comparison Table for Medical X-Ray Imaging Devices Mammography
$30
NEMA/MITA SAC 1-2020
Published Date: 2020
White Paper on Understanding Accountability in Medical Device Servicing
$14.7