AWWA ACE99399 PDF

AWWA ACE99399 PDF

Name:
AWWA ACE99399 PDF

Published Date:
01/01/1999

Status:
Active

Description:

The Greenville DAF WTP Experience: From Initial Process Selection Through Construction

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The Greenville Water System (GWS) in Greenville, South Carolina, is developing a new 75-mgd water treatment plant to filter water from Table Rock and North Saluda reservoirs. This is the largest construction project ever undertaken by the water system and, when completed, will be the largest dissolved air flotation (DAF) water treatment plant in the United States. Because the size and importance of the project, coupled with the technology and construction challenges at the new plant, GWS carefully evaluated process alternatives, and implemented enhanced design and construction procedures to meet their goals of quality, schedule, and cost. This paper examines the successes of those procedures through project development from the initial process selection through design and construction of the water treatment plant and related facilities.
File Size : 1 file , 170 KB
ISBN(s) : 1583210016
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 01/01/1999

History


Related products

AWWA ACE99312
Published Date: 01/01/1999
The Role of Multiple Water Quality Objectives in Treatment Modification Selection for Compliance With the D/DBP Rule
$7.2
AWWA ACE99371
Published Date: 01/01/1999
A New Look at an Old Technology - Slow Sand Filtration
$7.2
AWWA ACE99372
Published Date: 01/01/1999
Successful Use of Alternative Technology on the Hoopa Indian Reservation
$7.2
AWWA ACE99420
Published Date: 01/01/1999
Evaluating Performance of Backwash Water Treatment Processes Using Indigenous Aerobic Bacterial Spores
$7.2

Best-Selling Products