AWWA ACE99410 PDF

AWWA ACE99410 PDF

Name:
AWWA ACE99410 PDF

Published Date:
01/01/1999

Status:
Active

Description:

New Life for Old Facilities, the City of Buckley, Washington, Slow Sand Filter

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of Buckley has a population of approximately 5,000 residents and is a rural Washington State community located about 40 miles southeast of Seattle. Like many communities using an unfiltered surface water source, the City was required by the Washinton State Department of Health (DOH) to provide a treatment system capable of meeting the Surface Water Treatment Rule (SWTR). The high costs associated with most treatment processes were beyond the City's financial capability. Instead, the City embarked upon an ambitious plan to restore a structurally failed 1.0 million gallon ground-level concrete reservoir, upgrade a 60-year old control weir house, and construct within these components a 1 million gallon per day (MGD) slow sand filtration plant. Successfully completed in 1997 for approximately $400,000, the slow sand filtration plant currently operates at 1.2 MGD and is driven by less than 24 inches of hydraulic head. Nearly all of the original 1930s era facilities were utilized in the construction of the treatment plant. Power at the site is required only for the chlorinator, programmable logic controller and an electric actuated valve. This presentation describes the project from initial pilot plant testing through construction and final startup. The challenges associated with restoring abandoned facilities, incorporating existing components into a unique design process, and overcoming site construction issues are examined with the use of a slide presentation. Instrumentation, sand cleaning, and startup issues are discussed as well. The engineering feasibility of economically utilizing existing structures to meet future regulatory requirements was demonstrated by the City of Buckley slow sand filtration project. The applicability of renovating facilities for similar processes could be expanded to other small municipalities.
File Size : 1 file , 420 KB
ISBN(s) : 1583210016
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 21
Published : 01/01/1999

History


Related products

AWWA ACE99335
Published Date: 01/01/1999
Statistical Models for Assessing the Technical State of Water Networks - Some European Experiences
$7.2
AWWA ACE99437
Published Date: 01/01/1999
Private Utility Companies: "Friends Not Foes"
$7.2
AWWA ACE99475
Published Date: 01/01/1999
Characterization of Protozoan Occurrence in a Protected Watershed
$7.2
AWWA ACE99487
Published Date: 01/01/1999
Conservation in a Water Rich Area: A Cost Effective Source of Supply, or a Shot in the Dark?
$7.2

Best-Selling Products