AWWA CSC91063 PDF

AWWA CSC91063 PDF

Name:
AWWA CSC91063 PDF

Published Date:
01/01/1991

Status:
Active

Description:

Computer Assisted High Service Pump Selection

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Most of the electrical cost associated with the water treatment process can be attributed to high service pumping. Overall electrical savings can be achieved through better selection of pump combinations and peak load can be reduced through better use of elevated storage. The City of Arlington, Texas, developed an Expert System for Energy Management (ESEM) to assist water treatment plant operators in making a more logical selection of high service pumps. The ESEM software is made up of three components: a time series analysis component for forecasting future demand, a dynamic programming algorithm module for optimal pump selection, and a knowledge based system. Two hardware components are required: a computer to collect and archive data (called a CADA) and a personal computer; the personal computer interfaces with the CADA. The operating cycle runs continuously, beginning with the ESEM extracting the required data from the CADA system and generating a consumption demand schedule for the next 24 hours. The operator has the opportunity to modify the demand schedule (because the model cannot take into account weather or catastrophic events). Once the demand schedule is finalized, the pump optimization algorithm can generate a pumping schedule for the next 24 hours that will minimize peak electrical consumption. In theory ESEM works like a charm, but has yet to prove itself in the real world.
File Size : 1 file
ISBN(s) : 0898675812
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/1991

History


Related products

AWWA CSC91089
Published Date: 01/01/1991
Computerizing the Distribution System Deterioration
$7.2
AWWA CSC91088
Published Date: 01/01/1991
Computerized Distributed Control System Design Integrated into Plant Upgrade
$7.2
AWWA CSC91081
Published Date: 01/01/1991
Mobile, Alabama Water Treatment Facility Design by CADD
$7.2
AWWA CSC91080
Published Date: 01/01/1991
Lessons Learned - How to assure a Successful Process Control Project
$7.2

Best-Selling Products

NS-ISO 1000:1992
Published Date: 12/18/1996
SI units and recommendations for the use of their multiples and of certain other units
NS-ISO 10001:2007
Published Date: 05/01/2014
Quality management — Customer satisfaction — Guidelines for codes of conduct for organizations
NS-ISO 10001:2018
Published Date: 02/01/2019
Quality management — Customer satisfaction — Guidelines for codes of conduct for organizations
NS-ISO 10002:2004
Published Date: 08/10/2004
Quality management - Customer satisfaction - Guidelines for complaints handling in organizations
NS-ISO 10002:2014
Published Date: 07/01/2015
Quality management — Customer satisfaction — Guidelines for complaints handling in organizations
NS-ISO 10002:2018
Published Date: 02/01/2019
Quality management — Customer satisfaction — Guidelines for complaints handling in organizations