AWWA CSC91073 PDF

AWWA CSC91073 PDF

Name:
AWWA CSC91073 PDF

Published Date:
01/01/1991

Status:
Active

Description:

Prequalification - One of the Keys to Successful Process Control System Procurement

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
When the Detroit Water and Sewerage Department undertook the project of a new department-wide instrumentation control and computer systems program, it knew that such a system must be supplied and installed by qualified manufacturers and suppliers. The department used a "Solicitation of Qualifications" (SOQ) as the main part of the prequalification procedure. The SOQ described the project's scope and complexity and asked a series of questions which identified those contractors best qualified to participate in the project. Included with the SOQ were documents relating to minority and women's business participation; anyone responding to the SOQ had to comment on the applicability of these documents to the project. The contents of the SOQ included an introduction and overview, objectives, features required to meet the objectives, typical and mandatory functions, concept diagram of equipment, and information on the numbers and types of key equipment. The SOQ also contained information on the construction schedule, preparation and submittal instructions, and more than 500 technical, business, and management questions regarding the responder's experience, technical resources, financial health, and system features. Teams reviewed the responses to the SOQ. The answers to the questions were scored and the scores were tabulated using a spreadsheet. The contractors were reviewed based on their scores. All information was documented to allow review with anyone disputing the results of the process.
File Size : 1 file
ISBN(s) : 0898675812
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 6
Published : 01/01/1991

History


Related products

AWWA CSC91092
Published Date: 01/01/1991
A Fast-Track SCADA Project for the World's Largest New Potable Water System
$7.2
AWWA CSC91081
Published Date: 01/01/1991
Mobile, Alabama Water Treatment Facility Design by CADD
$7.2
AWWA CSC91068
Published Date: 01/01/1991
Computerized Water System Optimization
$7.2
AWWA CSC91057
Published Date: 01/01/1991
Integration of a GIS with a Water Distribution Network Model
$7.2

Best-Selling Products