AWWA CSC92049 PDF

AWWA CSC92049 PDF

Name:
AWWA CSC92049 PDF

Published Date:
01/01/1992

Status:
Active

Description:

A Cost-Benefit Study of a GIS Implementation in Small to Medium Size Water Utilities

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In looking at any cost/benefit study, one must examine both words; Costs and Benefits. In a GIS implementation this is especially true because of the many parts that make up such a system. It is also important to the small to medium sized utility which does not have the time, money or manpower to implement a system that could compete with that of a larger utility. Any company, big or small can benefit from the use of GIS. In the case of the Toms River Water Company, the benefits range from $2.20 per customer savings (tangible benefits) to better communications and effective use of data (intangible benefits). Needs analysis, potential cost benefits, hardware and software, application development, training, and implementation pitfalls information is given.
File Size : 1 file
ISBN(s) : 0898676347
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 01/01/1992

History


Related products

AWWA CSC92091
Published Date: 01/01/1992
Computerized Water Treatment Plant O&M Manuals
$7.2
AWWA CSC92053
Published Date: 01/01/1992
Increasing Water System Efficiency Through the Use of Distributed Control Systems and On-Line Instrumentation
$7.2
AWWA CSC92040
Published Date: 01/01/1992
Effective Implementation of PLC/Computers Into Plant Process Control and Monitoring
$7.2
AWWA CSC92035
Published Date: 01/01/1992
Building an Integrated Management Information System
$7.2

Best-Selling Products