AWWA CSC94042 PDF

AWWA CSC94042 PDF

Name:
AWWA CSC94042 PDF

Published Date:
01/01/1994

Status:
Active

Description:

CAP Plant Intensifies Lab Management Issues at Tucson Water

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Tucson Water's workload has been increasing in size and complexity for several years, growing to the point where the laboratory was becoming unable to successfully meet commitments and regulatory requirements. A large part of the problem has been addressed by implementation of a LIMS, including several customized programs to handle sample scheduling, QA/QC, and microbiological benchsheets. It is Tucson Water's expectation that the LIMS will enable the lab to better meet increasing requirements while minimizing staff increases.
File Size : 1 file
ISBN(s) : 0898677343
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1994

History


Related products

AWWA CSC94043
Published Date: 01/01/1994
From the 1950s to the 1990s: An On-Line Control, Information Management and SCADA System Retrofit Into a 1950s Vintage High Capacity Water Transmission Treatment and Distribution System
$7.2
AWWA CSC94047
Published Date: 01/01/1994
Integrating a Network Model With an Expert System
$7.2
AWWA CSC94045
Published Date: 01/01/1994
The Development and Application of a Large Computer Model - An Example Utilizing the Los Angeles Aqueduct System
$7.2
AWWA CSC94021
Published Date: 01/01/1994
SCADA Using 800 MHz Trunked Radio
$7.2

Best-Selling Products

Machinery Component Maintenance & Repair
Published Date: 09/01/1997
$29.7