AWWA DSS60319 PDF

AWWA DSS60319 PDF

Name:
AWWA DSS60319 PDF

Published Date:
09/29/2004

Status:
Active

Description:

Water Distribution System Replacement Utilizing Pre-Chlorinated Pipe Bursting

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The National Park Service (NPS) engaged CDM to design and construct improvements to its Flamingo water system, including the complete replacement of its water distribution system. The Flamingo area is the largest developed area within Everglades National Park (Park) and includes a visitor's center, restaurant facilities, and housing to accommodate visitors from all over the world. The existing water distribution system consists of 25,000 linear feet of 6-, 4-inch asbestos concrete and polyvinyl chloride water mains. The majority of the distribution system was constructed in 1947. The plan for the water distribution system replacement utilized almost entirely trenchless construction, minimizing impacts to valuable environmentally sensitive and irreplaceable natural resources; the main distribution lines were replaced using high-density polyethylene (HDPE) pipeline by the pipe bursting method. The polyethylene pipelines were pre-chlorinated to disinfect and bacteriologically clear the line above ground prior to installation. This allowed the new lines to be placed into service immediately with minimal disruption to the visitors and residents at the Park. This project is the largest application to date in total linear footage of this technology in North America. This paper documents the installation of the new pipelines, focusing on the use of pipe bursting and pre-chlorination techniques.
Edition : Vol. - No.
File Size : 1 file , 850 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 09/29/2004

History


Related products

AWWA DSS60311
Published Date: 09/29/2004
Managing Today's Workforce
$7.2
AWWA DSS60312
Published Date: 09/29/2004
Here Come Those New Federal Regulations for Water Treatment and Distribution System Operators
$7.2
AWWA DSS60316
Published Date: 09/29/2004
Proactive Planning for Water Main Replacement/Rehabilitation for the City of Chicago
$7.2
AWWA DSS60327
Published Date: 09/29/2004
Biofilm Problems in the Distribution System: Detection, Removal and Control
$7.2

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9