This slide presentation outlines information on the Initial Distribution System Evaluation (IDSE) in relation to disinfection byproducts (DBPs) in the distribution system. Topics covered include: Stage 2 Disinfection Byproducts Rule (DBPR) and the IDSE; IDSE background; conducting and IDSE; IDSE waiver eligibility; IDSE options, Standard Monitoring Program (SMP) and System-Specific Study (SSS); minimum model requirements; Stage 2 DBPR compliance sites; IDSE reporting schedule; and, a case study of AwwaRF Project #2770, "Formation and Decay of DBPs
in the Distribution System".
| Edition : | Vol. - No. |
| File Size : | 1
file
, 1.1 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 35 |
| Published : | 09/01/2005 |