This powerpoint presentation begins by providing a brief overview of the buzzwords "sustainability" and "asset management". The presentation provides a process map for the asset management process. An example of asset management is presented at Clifton Forge, Virginia, which was facing the following challenges: aging infrastructure mostly ignored for 50 years; mounting environmental, public health risks;
ongoing regulatory oversight;
limited financial and staff resources; and,
inadequate technology. Clifton Forge results for water system include the following:
water treatment plant improvements;
water meter installation; preliminary asset inventory; hydraulic water model;
leak detection program; and,
data collection for consumption analyses. Clifton Forge results for sewer system include the following: preliminary asset inventory; preliminary condition assessments;
flow monitoring program; sub basin analyses;
hydraulic sewer model;
comprehensive inspection / maintenance program; and,
asset management plan. Includes tables.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 6.5 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 47 |
| Published : | 11/01/2008 |