This powerpoint presentation begins by providing a brief overview of the city of Arlington, Texas, and its current water system. Reasons for a master plan and model update are provided, along with model development issues, and
calibration and
operational issues. Various benefits are presented, and lessons learned include the following:
field verify pressure plane boundaries
prior to field testing;
utilize billing data for initial demand
distribution;
perform detailed review of geographic information system (GIS)
connectivity again and again; and,
field verify supervisory control and data acquisition (SCADA) measurements, where possible. Includes figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 6.5 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 29 |
| Published : | 11/01/2008 |