This powerpoint presentation begins by providing a brief overview of Spartanburg Water and its pro-active position
concerning identification of aging infrastructure in
need of rehabilitation. A condition assessment of the Union Street pipeline is presented, along with Spartanburg Water responsibilities that included the following:
provide insertion point(s)
with 2" diameter opening;
SCDOT Coordination;
media notification;
traffic control during the
inspection process; and,
velocity control. Benefits of the leak condition assessment are provided.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 1.9 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 19 |
| Published : | 11/01/2008 |