AWWA DSS90004 PDF

AWWA DSS90004 PDF

Name:
AWWA DSS90004 PDF

Published Date:
01/01/1990

Status:
Active

Description:

Cross Connection Control Inspection Procedures

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Inspection can mean the difference between an effective cross connection control program and a paper tiger. Coordination and education can accomplish a large portion of the work necessary in a program; regulation makes up the rest. Each of these aspects is present in the individual activities which are included in the inspection function: assessing the system, selecting a strategy, preparing yourself, inspecting existing facilities, review plans, and inspecting new construction. These procedures, properly set up and adhered to, can simplify cross connection control program management.
File Size : 1 file
ISBN(s) : 0898675537
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1990

History


Related products

AWWA DSS90023
Published Date: 01/01/1990
Leak Detection State-of-the-Art in the Soviet Union
$7.2
AWWA DSS90020
Published Date: 01/01/1990
The Care and Feeding of Main Distribution Valves
$7.2
AWWA DSS90019
Published Date: 01/01/1990
Basic Maintenance Procedures and Troubleshooting Tips for Automatic Control Valves
$7.2
AWWA DSS90014
Published Date: 01/01/1990
Oxygen/Ozone Water Treatment A Start Up and Operation Experience
$7.2

Best-Selling Products

VDI/VDE/ATV 3552 - DRAFT
Published Date: 10/01/2006
Draft Document - Use of field bus systems in water supply plants