AWWA DSS90011 PDF

AWWA DSS90011 PDF

Name:
AWWA DSS90011 PDF

Published Date:
01/01/1990

Status:
Active

Description:

Automation Slide Presentation

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
During a review conducted in 1988, it was recognized that the increased level of construction associated with the region's acceleration of growth had placed a strain on Pennsylvania Gas & Water Company's (PGWC) ability to cope effectively with the work load. PGWC needed to provide more complete, accurate, and timely information which would provide project status and information. A completely new automated system, Project Tracking System was initiated.
File Size : 1 file
ISBN(s) : 0898675537
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1990

History


Related products

AWWA DSS90027
Published Date: 01/01/1990
Use and Selection of Automatic Air Valves
$7.2
AWWA DSS90025
Published Date: 01/01/1990
Portland Water Bureau's Leak Detection Program
$7.2
AWWA DSS90031
Published Date: 01/01/1990
Safe and Sanitary Procedures for Underwater Inspection of Your Reservoirs
$7.2
AWWA DSS90028
Published Date: 01/01/1990
Biofilm Sampling and Bacteriological Results in Large Water Mains - Detroit, Michigan
$7.2

Best-Selling Products

B11 B11.0-2010
Published Date: 12/02/2010
Safety of Machinery; General Requirements and Risk Assessment
B11 B11.0-2020
Published Date: 12/16/2019
Safety of Machinery
B11 B11.0-2023
Published Date: 06/27/2023
Safety of Machinery
$71.7
B11 B11.1-2001
Published Date: 01/01/2001
Safety Requirements for Mechanical Power Presses
B11 B11.1-2009 (R2020)
Published Date: 04/07/2009
Safety Requirements for Mechanical Power Presses
$29.7
B11 B11.10-2003 (R2015)
Published Date: 08/26/2003
Safety Requirements for Metal Sawing Machines
$23.7