AWWA EDC52010 PDF

AWWA EDC52010 PDF

Name:
AWWA EDC52010 PDF

Published Date:
01/01/1999

Status:
Active

Description:

Next Generation Pump Station Design: Lessons Learned From the Design and Construction of Two Prototypes

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
As part of the City of Cleveland, Ohio, Division of Water (CWD) efforts to improve its service, a decision was made to improve reliability, efficiency, control and reporting at the pump stations. About five years ago, the author was given the privilege of spearheading the research, design and construction of a water pump station to test newer technologies and set the standard for the next century's designs. This required a change in the manner Cleveland pumps water. In other words, it required the designers to completely disregard the paradigms traditionally dictating pump selection, control, instrumentation, etc. The term 'resiliency engineering' has been recently used. This means that systems should be engineered to operate within acceptable parameters for long periods of time with minimum resource allocation after start-up. That is, a 'resilient system' bounces back and performs under less than optimal conditions such as those caused by lack of maintenance and change in operating conditions or customer demand. Although the authors were not aware of the term 'resiliency engineering' five years ago, they inadvertently followed that philosophy because their research and interviews of operations' personnel identified a need for such a design strategy. In researching the subject of pump station design, they acquired data from textbooks, articles, equipment manufacturers, other pump station designs, relevant equipment installations, standards, operational needs and requirements, and listened to operators and maintenance personnel's complaints. The result was about one hundred pages of dos and don'ts. Two pump stations have been designed and built using this recipe to date. A third pump station is presently under design. This paper discusses some of the lessons learned. Includes 13 references, figures.
Edition : Vol. - No.
File Size : 1 file , 120 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 01/01/1999

History


Related products

AWWA EDC52020
Published Date: 01/01/1999
Collaborative Approach to Integrating Design, Construction and O&M Expertise to Reduce Construction and Life-Cycle Costs
$7.2
AWWA EDC52042
Published Date: 01/01/1999
Selecting the Right Time to Rehabilitate/Replace Water Treatment Plant Infrastructure: Philadelphia's Strategic Plan for Avoiding Catastrophic Failure
$7.2
AWWA EDC52025
Published Date: 01/01/1999
Construction and Startup of a 20-mgd Carbonic Acid Air Stripping Process for Hydrogen Sulfide Removal
$7.2
AWWA EDC52023
Published Date: 01/01/1999
Getting the Equipment the Owner (Not the Contractor) Wants at a Competitive Price: Pre-bidding Emerging Technologies
$7.2

Best-Selling Products

AHAM AC-1-2006
Published Date: 2006
Air Cleaners - Portable - CADR
$30
AHAM AC-1-2018
Published Date: 2018
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-1-2020
Published Date: 12/14/2020
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-2-2006 (R2016)
Published Date: 2006
Method for Sound Testing of Portable Household Electric Room Air Cleaners
$12
AHAM AC-3-2009
Published Date: 2009
Room Air Cleaners
$12
AHAM AC-4-2022
Published Date: 07/22/2022
Method of Assessing the Reduction Rate of Chemical Gases by a Room Air Cleaner
$60