AWWA INF52164 PDF

AWWA INF52164 PDF

Name:
AWWA INF52164 PDF

Published Date:
01/01/2000

Status:
Active

Description:

Assessing the Prioritization of Capital Improvements for Twenty-Six Open-Cut Reservoirs

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The East Bay Municipal Utility District of Oakland, California, owns and operates 26 open-cut reservoirs within its water distribution system. The oldest was constructed in 1884 and the newest in 1992. The purpose of this paper is to explain the development of the methodology for the improvement of the District's open-cut water distribution reservoirs. The proposed rehabilitation work required for each reservoir with corresponding cost estimates is prioritized based on improving water quality, worker safety, and water distribution reliability. District operations, maintenance, and the various regulatory agencies' requirements are also considered. Includes tables.
Edition : Vol. - No.
File Size : 1 file , 200 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 01/01/2000

History


Related products

AWWA INF52157
Published Date: 01/01/2000
Strategic Planning for the San Francisco Water Department Capital Projects
$7.2
AWWA INF52172
Published Date: 01/01/2000
Evaluating the Condition of Existing Water Mains
$7.2
AWWA INF52167
Published Date: 01/01/2000
The Role of Financial Modeling in Preparing Water Infrastructure Plans
$7.2
AWWA INF52162
Published Date: 01/01/2000
A Maintenance Management Prioritization System for Water Storage Tanks
$7.2

Best-Selling Products