AWWA INF53968 PDF

AWWA INF53968 PDF

Name:
AWWA INF53968 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Resolving Design and Construction Issues of Large Diameter Pipelines

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The San Diego County Water Authority completed construction of Pipeline 5Extension, Phase II, commonly known as the Rancho Pe¿asquitos Pipeline during1998. This paper describes a number of solutions to challenges encountered duringdesign and construction, which may be beneficial to other major infrastructureprojects. This project addressed challenges in providing operational flexibilityto handle present, future, and emergency conditions, right-of-way restrictions,steep terrain, urban construction, protection of existing streams, multiple pipejoint designs, and special consideration for public coordination. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 560 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 06/01/2001

History


Related products

AWWA INF53951
Published Date: 05/01/2001
Creating an Asset Management Strategy: An Asset Management Template
$7.2
AWWA INF54002
Published Date: 06/01/2001
East Bay Municipal Utility District: Water System Operations and Technical Manual Project
$7.2
AWWA INF53994
Published Date: 06/01/2001
Modifying 75% of Delivery Capacity While Maintaining 100% System Capacity: Meeting Glendale's Water Demands During Facility Upgrades
$7.2
AWWA INF53975
Published Date: 06/01/2001
Economic Analysis of Watermain Management Options: Cathodic Protection, "Hot Spot" Repairs, or Renewal
$7.2

Best-Selling Products

ICML 55.1
Published Date: 2019
ICML 55.1 Standard - Part 1: Asset Management. Requirements for the Optimized Lubrication of Mechanical Physical Assets