AWWA INF55784 PDF

AWWA INF55784 PDF

Name:
AWWA INF55784 PDF

Published Date:
01/01/2002

Status:
Active

Description:

San Diego Water Assesses Pipeline Replacement Options Using GA Optimization

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of San Diego faces a two-pronged infrastructure challenge as it seeks to provide continued excellence in water service to its customers. The City continues to undergo rapid growth in many areas of the system, while at the same time facing an accelerating need for rehabilitation and replacement of aging transmission and distribution mains. Over the coming years, these challenges could place a significant strain on the water system infrastructure if proper planning and execution of capital projects are not accomplished in a timely manner. The Water Policy, CIP Finance, and Planning Division of City of San Diego Water Department (SDW) is responding to this challenge by applying optimization analysis to help identify the most cost-effective and hydraulically appropriate planning solutions. This paper describes a cutting-edge genetic algorithm (GA) optimization study of pipeline replacement options that SDW recently completed for its Alvarado Water Treatment Plant service area. The GA consultants customized their software to suit SDW's Alvarado area hydraulic model, then proceeded to optimize rehabilitation and replacement options for 25.7 miles of existing pipelines and 10.5 miles of potential new pipes. SDW is now moving ahead to implement the first stages of the resulting $35 million year 2030 optimized Alvarado area plan. Includes 4 references, figures.
Edition : Vol. - No.
File Size : 1 file , 270 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 01/01/2002

History


Related products

AWWA INF55787
Published Date: 01/01/2002
Project Team Uses Effective Planning, Engineering, and Public Relations Tools for Raw Water Main Replacement Project
$7.2
AWWA INF55788
Published Date: 01/01/2002
Utilization of Reliability Centered Maintenance
$7.2
AWWA INF55793
Published Date: 01/01/2002
Construction Planning and Scheduling: Techniques for Motivating Contractors with Money
$7.2
AWWA INF55783
Published Date: 01/01/2002
Accommodating the Future in the Past: The Success of Washington Aqueduct's Modernization Under the Constraints of the National Historic Preservation Act
$7.2

Best-Selling Products