AWWA INF55792 PDF

AWWA INF55792 PDF

Name:
AWWA INF55792 PDF

Published Date:
01/01/2002

Status:
Active

Description:

Epoxy Lining of Cast Iron Pipe: Pilot Project

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper describes the pilot work undertaken by EPCOR Water Services Inc. in 2001 in the application of epoxy lining to cast iron water mains in Edmonton. The project began with analysis of the impact of the selected lining material on water quality by performing tests on samples in the water quality laboratory. This testing was followed by analysis of water from customer's taps before the project to establish a baseline of water quality within the water distribution system. Upon completion of installation of the lining, water quality in the main was monitored prior to returning the pipe to service to ensure that the lining caused no adverse impact on the quality of water. Hydraulic performance testing of the water mains was also undertaken before and after the project. The goal of this testing was to ascertain if the new lining had an impact on the hydraulic performance of the pipe and the associated ability of the system to deliver adequate quantities of water for fire protection. Customer service throughout the pilot project was another key project consideration, particularly in the area of service interruption and construction activity notification.
Edition : Vol. - No.
File Size : 1 file , 140 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/2002

History


Related products

AWWA INF55787
Published Date: 01/01/2002
Project Team Uses Effective Planning, Engineering, and Public Relations Tools for Raw Water Main Replacement Project
$7.2
AWWA INF55789
Published Date: 01/01/2002
Outpost 5(TM): Standardized Water and Wastewater Monitoring and Control System
$7.2
AWWA INF55793
Published Date: 01/01/2002
Construction Planning and Scheduling: Techniques for Motivating Contractors with Money
$7.2
AWWA INF55791
Published Date: 01/01/2002
Managing the Utility's Exposure to Risk: An Alternative Approach to Infrastructure Management
$7.2

Best-Selling Products

SN-CEN/CLC/ETSI TR 101550:2014
Published Date: 02/19/2014
Documents relevant to EN 301 549 "Accessibility requirements suitable for public procurement of ICT products and services in Europe"
SN-CEN/CLC/ETSI TR 101550:2022
Published Date: 07/01/2022
Documents relevant to EN 301 549 (V1.1.1) "Accessibility requirements suitable for public procurement of ICT products and services in Europe"
SN-CEN/CLC/ETSI TR 101551:2014
Published Date: 02/19/2014
Guidelines on the use of accessibility award criteria suitable for public procurement of ICT products and services in Europe
SN-CEN/CLC/ETSI TR 50572:2011
Published Date: 12/16/2011
Functional Reference Architecture for Communications in Smart Metering Systems