AWWA JAW10791 PDF

AWWA JAW10791 PDF

Name:
AWWA JAW10791 PDF

Published Date:
01/01/1984

Status:
Active

Description:

Journal AWWA - Evaluating the Safety and Seismic Stability of Embankment Reservoirs

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
Open storage reservoirs formed by earthen embankments may be classified as facilities with a high seismic hazard potential, especially if the surrounding areas have been heavily developed. In 1979-80, the Seattle Water Department (SWD) retained a geotechnical engineering firm to provide safety evaluations of 12 reservoir embankments and to provide stability analyses to evaluate the expected performance of 9 of these facilities in the event of earthquakes. This article describes the seismicity of the Seattle area, items that should be included in safety inspections, geotechnical seismic stability analyses, and recommended performance measurements. The evaluations of the SWD reservoirs are used as examples. Results of seismic analyses determined that the earthen embankments could withstand likely levels of shaking in this earthquake-prone area. Suggestions are also presented for implementing procedures for controlling vegetation near the embankments, as well as recommendations for outlet controls, underdrain outlets, recordkeeping, and inspections. Includes 1 reference, table, figures.
Edition : Vol. 76 - No. 1
File Size : 1 file , 5.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 6
Published : 01/01/1984

History


Related products

AWWA JAW10792
Published Date: 01/01/1984
Journal AWWA - Keeping Old Reservoirs Active
$9
AWWA JAW10793
Published Date: 01/01/1984
Journal AWWA - Cathodic Protection of Water Storage Tanks
$9
AWWA JAW10794
Published Date: 01/01/1984
Journal AWWA - Computer Modeling Solves a Water Storage Problem
$9
AWWA JAW10796
Published Date: 01/01/1984
Journal AWWA - Selecting and Applying Protective Coatings
$9

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9