Large doses of alum used for flocculation by the Onondaga County Water Board caused a buildup of aluminum and silicone oxides on the interior of large distribution pipes. Flow was restricted to the point that supplying demand during peak usage might have become a problem. Planning for a pigging operation was begun in 1983, and the job was successfully undertaken the following year without disrupting production of a major industrial user. The authors describe how the pigging operation was done and the improvement that resulted. Includes figure.
| Edition : | Vol. 78 - No. 11 |
| File Size : | 1
file
, 2.2 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 4 |
| Published : | 11/01/1986 |