AWWA JAW37661 PDF

AWWA JAW37661 PDF

Name:
AWWA JAW37661 PDF

Published Date:
02/01/1995

Status:
Active

Description:

Journal AWWA - Enhanced Coagulation: A Preliminary Evaluation

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
Researchers conducted prelimary enchanced coagulation tests at the Metropolitan Water Distict of Southern California's (MWDSC's) 5.5-mgd demonstration plant from August to October 1992. California State project water and Colorado River water were tested. The first goal was to determine whether this mode of operation is an effective strategy for controlling disinfection byproducts (DBPs) and DBP precursors at MWDSC facilities. If this strategy proved to be successful, the second objective was to estimate the additional operational costs of complying with the proposed Disinfectants/DBP Rule and to identify the coagulation conditions that minimize these costs. Although the results show that enhanced coagulation can meet the criteria being considered for the rule, this process will increase MWDSC's cost of treatment. Includes 19 references, tables, figures.
Edition : Vol. 87 - No. 2
File Size : 1 file , 800 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 02/01/1995

History


Related products

AWWA JAW18198
Published Date: 01/01/1986
Journal AWWA - Diatomaceous Earth Filtration of Giardia Cysts and Other Substances
$9
AWWA JAW37662
Published Date: 02/01/1995
Journal AWWA - Preservation of Trace Metals in Water Samples
$9
AWWA JAW37660
Published Date: 02/01/1995
Journal AWWA - Measuring UV-Absorbing Organics: A Standard Method
$9
AWWA JAW37659
Published Date: 02/01/1995
Journal AWWA - Field Evaluation of the GWDR's Natural Disinfection Criteria
$9

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36