AWWA JAW46187 PDF

AWWA JAW46187 PDF

Name:
AWWA JAW46187 PDF

Published Date:
07/01/1997

Status:
Active

Description:

Journal AWWA - Communication Strategies for Pipeline Construction

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
The San Diego County Water Authority has nearly completed a 3.4-mi (5.5-km), 72-in.-(1,830-mm-) diameter potable water pipeline and associated facilities in northwest San Diego County, California. The north county distribution pipeline project includes the pipeline, three flow control and metering facilities, a 1-mil-gal (0.0004 x 10 6-m3) prestressed concrete regulating structure, and a chlorine contact tank. The pipeline parallels and crosses two 24-in.-(610-mm-) diameter potable lines that serve 85 percent of the daily water supply to Oceanside, California. Construction began in March 1995 and concluded late in 1996. Includes figures.
Edition : Vol. 89 - No. 7
File Size : 1 file , 1.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 07/01/1997

History


Related products

AWWA JAW19251
Published Date: 06/01/1986
Journal AWWA - Toxicological Problems Associated With Chlorine Dioxide
$9
AWWA JAW46192
Published Date: 07/01/1997
Journal AWWA - Testing the SANCHO Model on Distribution Systems
$9
AWWA JAW46191
Published Date: 07/01/1997
Journal AWWA - Service Lines: Their Effect on Microbiological Quality
$9
AWWA JAW46190
Published Date: 07/01/1997
Journal AWWA - Chloramination: Its Effect on Distribution System Water Quality
$9

Best-Selling Products

IEEE/ASTM SI 10-2002
Published Date: 12/30/2002
IEEE/ASTM Standard for Use of the International System of Units (SI): The Modern Metric System
$23.7
IEEE/ASTM SI_10-2010
Published Date: 04/11/2011
American National Standard for Metric Practice
$32.7