AWWA JAW48192 PDF

AWWA JAW48192 PDF

Name:
AWWA JAW48192 PDF

Published Date:
08/01/1998

Status:
Active

Description:

Journal AWWA - Implementing a Large-Meter Replacement Program

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
This article discusses how a comprehensive large-meter replacement program can help utilities avoid revenue losses caused by malfunctioning meters and increase reliability of service to customers. The following five phase program is outlined and discussed: phase 1 - create a large-meter database; phase 2 - perform field inspection of meter, and conduct customer site survey; phase 3 - prepare hydraulic calculations, and design meter setting; phase 4 - perform cost-benefit analysis and construction; and, phase 5 - update meter database and track meter performance. Includes 2 references, tables.
Edition : Vol. 90 - No. 8
File Size : 1 file , 760 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 08/01/1998

History


Related products

AWWA 51569
Published Date: 12/01/2000
UV/H2O2-Treatment: The Ultimate Solution for Pesticide Control and Disinfection
$7.2
AWWA JAW48196
Published Date: 08/01/1998
Journal AWWA - Monitoring DBP Formation With Differential UV Spectroscopy
$9
AWWA JAW48195
Published Date: 08/01/1998
Journal AWWA - Using Hydraulic Modeling to Optimize Contact Time
$9
AWWA JAW48194
Published Date: 08/01/1998
Journal AWWA - Small System Maintenance Management Using GIS
$9

Best-Selling Products

ANL CNSV-TM-190
Published Date: 01/01/1990
Users Guide to Diane Version 2.1: A Microcomputer Software Package for Modeling Battery Performance in Electric Vehicle Applications