AWWA JOINT53563 PDF

AWWA JOINT53563 PDF

Name:
AWWA JOINT53563 PDF

Published Date:
01/01/2001

Status:
Active

Description:

How to Develop and Implement an Affirmative Action Plan: "A Louisville Water Company Case Study"

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Measuring diversity within an organization is about assessing and drivingorganizational change and impact. It is about implementing metrics and creatingtools that ensure the creation, management, valuing, and leveraging of a diverseworkforce for organizational effectiveness and sustained competitiveness. Themost common measures, Equal Employment Opportunity (EEO) and Affirmative Action(AA) Metrics, provide the foundation for evaluation of workforce composition.Although EEO/AA metrics are limited, they are critical to the creation of avisibly diverse workforce that reflects both the available labor pool andexternal customer base. More detailed measures for managing and valuing a diverseworkforce can be said to fall into three categories: programmatic; organizationalculture; and, accountability. This paper describes these measures ingreater detail, along with the many critical elements associated with thedevelopment and implementation of the new "Affirmative Action Program Plan" atLouisville Water Company of Louisville, Kentucky, which began in October 1999. Includes 3 references.
Edition : Vol. - No.
File Size : 1 file
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 01/01/2001

History


Related products

AWWA JOINT53618
Published Date: 01/01/2001
GASB 34 Regulations and Asset Infrastructure Management
$7.2
AWWA JOINT53612
Published Date: 01/01/2001
Risk Assessment Process Aids in Prioritizing Water Distribution System Remediation
$7.2
AWWA JOINT53592
Published Date: 01/01/2001
Generational Issues in Recruitment and Retention
$7.2
AWWA JOINT53589
Published Date: 01/01/2001
City of Tempe Water Management Division Work Force Flexibility and Skill-Based Pay: Designing and Implementing Competitive Strategies
$7.2

Best-Selling Products

NIST HDBK 150
Published Date: 07/01/2016
National Voluntary Laboratory Accreditation Program Procedures and General Requirements
$14.1
NIST HDBK 150
Published Date: 02/01/2006
National Voluntary Laboratory Accreditation Program Procedures and General Requirements
$16.2
NIST HDBK 44
Published Date: 01/01/2018
Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices
$36
NIST NISTIR 6969
Published Date: 09/01/2014
Selected Laboratory and Measurement Practices and Procedures to Support Basic Mass Calibrations
$21.6
NIST NISTIR 7628
Published Date: 09/01/2014
Guidelines for Smart Grid Cybersecurity Volume 1 - Smart Grid Cybersecurity Strategy, Architecture, and High-Level Requirements
$39.6