AWWA JOINT53595 PDF

AWWA JOINT53595 PDF

Name:
AWWA JOINT53595 PDF

Published Date:
01/01/2001

Status:
Active

Description:

Planned Maintenance Teams

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
At the Unified Sewerage Agency of Hillsboro, Oregon, a Planned MaintenanceTeam was formed to review current practices, procedures, and safety equipment certification requirements. The goal of reviewing and modifying the planned maintenance programs (preventive, predictive, and non-destructive) started by brainstorming a list of issues. A comprehensive survey of 200 questions in 18 different categories that related to key principles, best practices, and leadership philosophies was also completed. Another goal of the Team was to ensure that proper equipment was appropriately tested and that there was consistency among the four United Sewerage Agency's facilities. A list of critical equipment for each facility was developed; non-destructive testing methods were evaluated and assigned. A pilot program for testing the effectiveness of a Planner/Scheduler position was established in order to improve scheduling in accordance with best management practices. This paper describes the efforts of the Planned Maintenance Team and the outcomes of these efforts. Includes 3 references, appendix.
Edition : Vol. - No.
File Size : 1 file
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 01/01/2001

History


Related products

AWWA JOINT53556
Published Date: 01/01/2001
Water Quality Management Within a Utility
$7.2
AWWA JOINT53609
Published Date: 01/01/2001
Changing Utility Business Practices and Improving Productivity in Pinellas County, Florida
$7.2
AWWA JOINT53598
Published Date: 01/01/2001
Realizing Return on Investment From Computerized Maintenance Management Software
$7.2
AWWA JOINT53579
Published Date: 01/01/2001
Leveraging Financial Performance Measures in Strategic Planning
$7.2

Best-Selling Products