AWWA MTC53871 PDF

AWWA MTC53871 PDF

Name:
AWWA MTC53871 PDF

Published Date:
05/01/2001

Status:
Active

Description:

From Pilot to Full-Scale Plant Start-Up: The Bexar Facility, Texas

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The Bexar Metropolitan Development Corporation has initiated a project at San Antonio,Texas. The DBO is a 9 mgd (34,000 m3/day) production capacity plant, which supplies250,000 inhabitants of San Antonio. United Water Services, Infilco Degr¿montInc. and Montgomery Watson have built the water treatment plant and will operate it for the next 20 years. Aqualifying pilot testing on site confirmed that the Superpulsator(R), a sludge blanket clarifierfrom Infilco Degr¿mont Inc., placed before the Aquasource UF membrane met the BexarMetropolitan Development Corporation's expectations in terms of water quality, reliabilityand cost effectiveness. Thus, the Aquasource UF membrane has been selected among threedifferent membrane suppliers. The facility was started in December 1999 as scheduled. Boththe client and the operator are satisfied with the 1st year of operation. This paper presents datafrom the pilot plant studies and the full-scale commissioning phase. Both water quality andoperational data are discussed. Includes 4 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 490 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 05/01/2001

History


Related products

AWWA MTC53678
Published Date: 05/01/2001
Extensive Renovation and Expansion of the Existing Palm Beach County WTP #3 Membrane Facility
$7.2
AWWA MTC53685
Published Date: 05/01/2001
Lavaca-Navidad River Authority Seawater Reverse Osmosis Facility
$7.2
AWWA MTC53686
Published Date: 05/01/2001
Comparison of Sand Filtration and Immersed Membrane Filtration for Treatment of a Lime Softened Florida Surface Water
$7.2
AWWA MTC53892
Published Date: 05/01/2001
A Small System's DBP Compliance Strategy Using Low Pressure Membranes
$7.2

Best-Selling Products

RIA-A3 R15.05-1-1990 (R1999)
Published Date: 01/01/1999
Evaluation of Point-to-Point and Static Performance Characteristics of Industrial Robots and Robot Systems
RIA-A3 R15.05-2-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Path-Related and Dynamic Performance Characteristics - Evaluation
RIA-A3 R15.05-3-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Reliability Acceptance Testing - Guidelines
RIA-A3 R15.06-1999 (R2009)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Safety Requirements
RIA-A3 R15.06-2012
Published Date: 03/28/2013
Industrial Robots and Robot Systems - Safety Requirements
$97.5
RIA-A3 R15.08-1-2020
Published Date: 12/25/2020
Industrial Robots and Robot Systems - Safety Requirements Part 1: Requirements for the Industrial Mobile Robot
$67.5