AWWA MTC61112 PDF

AWWA MTC61112 PDF

Name:
AWWA MTC61112 PDF

Published Date:
03/01/2005

Status:
Active

Description:

Good Water, Aggressive Flux, and Challenging Implementation

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines information on the City of St. Helens membrane project. Topics covered include: St. Helens background; water quality; piloting and procurement; flux impact cleaning frequency; pilot establishes economics; elements of procurement; membrane system information; operating parameters; comparison of Pall and Aquasource transmembrane pressures - St. Helens Pilot Test; St. Helens design run raw and permeate water total particle counts (>2um); membrane plant equipment costs, 8 mgd plant with BW water recovery; and, annual costs excluding labor, 8 mgd membrane plant. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 830 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 17
Published : 03/01/2005

History


Related products

AWWA MTC61070
Published Date: 03/01/2005
Membrane Consortium Analysis of Large RO/NF Element Diameters
$7.2
AWWA MTC61076
Published Date: 03/01/2005
Procurement of Proprietary Membrane Systems from the Engineers' Perspective
$7.2
AWWA MTC61122
Published Date: 03/01/2005
Modeling and Testing a Pilot-Scale Wastewater Reclamation Plant
$7.2
AWWA MTC61144
Published Date: 03/01/2005
Chloramine Tolerance of Polyamide Membranes: Experiences with Iron-Coagulant Residuals
$7.2

Best-Selling Products

HFES 100
Published Date: 01/01/2007
Human Factors Engineering of Computer Workstations
$28.5
HFES 200
Published Date: 01/01/2008
Human Factors Engineering of Software User Interfaces
$60
HFES 300
Published Date: 01/01/2004
Guidelines for Using Anthropometric Data in Product Design
$25.5
HFES HFES 400
Published Date: 01/01/2021
Human Readiness Level Scale in the System Development Process