AWWA MTC61177 PDF

AWWA MTC61177 PDF

Name:
AWWA MTC61177 PDF

Published Date:
03/01/2005

Status:
Active

Description:

Controlling Costs for Desalting and Zero Liquid Discharge Brine Disposal

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The BPTC Valley Task Force was formed as part of the effort to determine the best practicable treatment and control (BPTC) for prevention of groundwater degradation due to elevated total dissolved solids (TDS) in effluent from wastewater treatment plants in the Tulare Lake Basin. The task force contracted with Carollo Engineers to develop unit cost data for processes capable of reducing salts in effluent prior to groundwater discharge, and separately for desalting groundwater extracted for potable use. Cost curves developed for this purpose are based on treatment alternatives consisting of membrane desalting and concentrate management resulting in zero liquid discharge (ZLD) - salts that would otherwise accumulate in groundwater would be removed and exported to a landfill as a solid waste. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 460 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 18
Published : 03/01/2005

History


Related products

AWWA WQTC60760
Published Date: 11/15/2004
Piloting Low Pressure RO Membranes for Treatment of Inland Brackish Water and Evaluation of Brine Disposal Options
$7.2
AWWA ACE61760
Published Date: 06/17/2005
State-of-Science and Emerging and Promising Technologies for Brine Disposal and Minimization for Reverse Osmosis Desalination
$7.2
AWWA MTC61071
Published Date: 03/01/2005
Meeting the Challenge of Construction, Operation and Maintenance of Large Scale RO Elements
$7.2
AWWA MTC61080
Published Date: 03/01/2005
A Two-fiber, Bench-scale Test of Ultrafiltration (UF) for Investigation of Fouling Rate
$7.2

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36