AWWA MTC64525 PDF

AWWA MTC64525 PDF

Name:
AWWA MTC64525 PDF

Published Date:
03/01/2007

Status:
Active

Description:

Value of Membrane Pilot Testing of New Surface Water Source in Upper East Tennessee

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines a membrane pilot testing project with the First Utility District of Hawkins County, in eastern Tennessee. Pilot testing objectives included: Holston River is new source without existing water treatment plant (WTP) data; determine necessary pretreatment processes or options; direct filtration or enhanced coagulation decisions; and, determine allowable bid parameters for flux rates, TMP, chemical usage, backwash / recovery rates. Pilot testing protocol involved: State of Texas Standards Used As General Guidance; Optimization (30-60 Days); Clean-In-Place (CIP); 30-Day Run at Optimized Rate; CIP; Integrity Test; 48-Hour Irreversible Fouling Test; and, Final Report. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 39
Published : 03/01/2007

History


Related products

AWWA MTC64549
Published Date: 03/01/2007
Indirect Potable Reuse Using Membrane Bioreactors and Reverse Osmosis
$7.2
AWWA MTC64567
Published Date: 03/01/2007
Meeting Criteria for Water and Wastewater Systems Simultaneously Using Reverse Osmosis and Zero Liquid Discharge Technology
$7.2
AWWA MTC64579
Published Date: 03/01/2007
Regional Solutions for Concentrate Management Facilitates the Decision-Making Process for Implementing Desalination
$7.2
AWWA MTC64503
Published Date: 03/01/2007
6 MGD Membrane Design/Build Expansion for Weatherford, Texas
$7.2

Best-Selling Products

SN-ISO/IEC TR 19788-11:2017
Published Date: 11/01/2017
Information technology — Learning, education and training — Metadata for learning resources — Part 11: Migration from LOM to MLR
SN-ISO/IEC TR 20000-10:2013
Published Date: 05/27/2014
Information technology — Service management — Part 10: Concepts and terminology
SN-ISO/IEC TR 20000-10:2015
Published Date: 02/01/2016
Information technology — Service management — Part 10: Concepts and terminology
SN-ISO/IEC TR 20000-4:2010
Published Date: 05/27/2014
Information technology — Service management — Part 4: Process reference model
SN-ISO/IEC TR 20000-5:2013
Published Date: 05/27/2014
Information technology - Service management - Part 5: Exemplar implementation plan for ISO/IEC 20000-1
SN-ISO/IEC TR 20000-9:2015
Published Date: 03/01/2015
Information technology — Service management — Part 9: Guidance on the application of ISO/IEC 20000-1 to cloud services