AWWA MTC69771 PDF

AWWA MTC69771 PDF

Name:
AWWA MTC69771 PDF

Published Date:
11/01/2009

Status:
Active

Description:

Case Study of Singapore's Largest Operating Advanced Water Reclamation Plant: The Ulu Pandan NEWater Plant

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This case study describes the Ulu Pandan NEWater Plant in Singapore. NEWater is a high-grade reclaimed water produced by further treating secondary treated effluent using a multi-stage (multiple barrier) water reclamation process involving micro/ultra membrane filtration, reverse osmosis and ultra-violet disinfection. Since 2003, NEWater has been used in Singapore for electronic microchip wafer fabrication, nonpotable applications in manufacturing processes, and air-conditioning cooling towers in commercial buildings. This use of NEWater has freed up a large amount of potable water for other purposes. Presently, a small percentage of the NEWater production is blended with reservoir water and then this blend undergoes additional water treatment for potable use. The Ulu Pandan NEWater Plant started operation in March 2007 and is currently the fourth and largest operational NEWater facility in Singapore. It has a production capacity of 39 million U.S. gallons per day (USmgd), or 148,000 cubic meters per day (m<sup>3</sup>/d), and was developed under a Design-Build-Own-Operate (DBOO) arrangement between PUB Singapore and Keppel Seghers NEWater Development Company Pte Ltd. MWH served as the Owner's (i.e. PUB's) representative for the development of the bid (tender) documents and evaluation of the bid (tender) submittals, in addition to other engineering and project management tasks. The following information is presented in this case study of the Ulu Pandan NEWater Plant: background and description; the DBOO delivery method and tender (bid) documents; process flow diagram and plant photographs; and, project timeline. Includes 10 references, figures.
Edition : Vol. - No.
File Size : 1 file , 910 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 11/01/2009

History


Related products

AWWA MTC69748
Published Date: 11/01/2009
Eighteen Months of Operation of the 360 ML/d OBM Process in the Lakeview Water Treatment Plant
$7.2
AWWA MTC69760
Published Date: 11/01/2009
Potable Water Purification Using a Photocatalytic Ceramic Membrane System "Case Study"
$7.2
AWWA MTC69769
Published Date: 11/01/2009
Developing Tools for Assessment of Low-Pressure Membrane Performance
$7.2
AWWA MTC69764
Published Date: 11/01/2009
Review of Nanofiltration Membrane Autopsies after Nine Years of Operation in a Drinking Water Plant
$7.2

Best-Selling Products

VDI VDE/VDI 2604
Published Date: 06/01/1971
Oberflaechen-Messverfahren; Rauheitsuntersuchung mittels Interferenzmikroskopie
$27
VDI VDI 02700 BLATT 13.1
Published Date: 05/01/2010
Ladungssicherung auf Strassenfahrzeugen - Grossraum- und Schwertransporte - Datenblatt zur Transportplanung von Grossraum- und Schwertransporten - Laengenberechnung
$9.3
VDI VDI 02700 BLATT 13.2
Published Date: 05/01/2010
Ladungssicherung auf Strassenfahrzeugen - Grossraum- und Schwertransporte - Datenblatt zur Transportplanung von Grossraum- und Schwertransporten - Winkelberechnung
$9.3
VDI VDI 03033
Published Date: 09/01/1995
Waermeuebertragungsanlagen - Musterformulare fuer ordnungsgemaesses Betreiben bzw. Dokumentieren
$16.8
VDI VDI 1000 BERICHTIGUNG
Published Date: 07/01/2020
VDI-Richtlinienarbeit - Grundsaetze und Anleitungen - Berichtigung zur Richtlinie VDI 1000:2017-02
$0.3
VDI VDI 1000
Published Date: 06/01/2010
VDI-Richtlinienarbeit - Grundsaetze und Anleitungen
$25.8