AWWA MTC93029 PDF

AWWA MTC93029 PDF

Name:
AWWA MTC93029 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Selective Nitrate Removal From Drinking Water by Nanofiltration in Combination With Ion Exchange

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
For public water supplies, the increase in nitrate concentration is becoming an important problem in many countries. Among the treatment processes available, the removal of nitrates by membranes and ion exchange has been thoroughly studied in recent years. This paper describes the basic principles of nitrate removal by reverse osmosis and by ion exchange. The proposed combined process of nanofiltration membranes with ion exchange resins is discussed in more detail.
File Size : 1 file
ISBN(s) : 0898677076
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 01/01/1993

History


Related products

AWWA MTC93043
Published Date: 01/01/1993
Cost and Performance Evaluation of RO and EDR Pilot Plant Operation
$7.2
AWWA MTC93027
Published Date: 01/01/1993
Nitrate Rejection by POU Membrane Processes
$7.2
AWWA MTC93019
Published Date: 01/01/1993
Nanofiltration Fouling by Natural Organic Matter and Role of Particles in Flux Enhancement
$7.2
AWWA MTC93017
Published Date: 01/01/1993
Rejection of Carbonic Acid Species in (Reverse Osmosis and) and Nanofiltration
$7.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1