AWWA QTC97216 PDF

AWWA QTC97216 PDF

Name:
AWWA QTC97216 PDF

Published Date:
01/01/1997

Status:
Active

Description:

San Francisco's Experience With the Partnership Program

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-qtc97216_228001

Choose Document Language:
7.20 €
Need Help?
The purpose of the Partnership for Safe Water (PSW) is to encourage US water suppliers to survey their facilities, treatment processes, operating and maintenance procedures, operator training and management practices to identify areas that will enhance a water system's ability to prevent contamination from Cryptosporidium, Giardia and other pathogens. The San Francisco Public Utilities Commission (SFPUC) joined the PSW in January 1996 with a commitment to complete all four phases. The Phase III assessment, which is based on the EPA's Composite Correction Program, involves the assessment of plant performance problems and implementation of corrective actions. During Phase III, a survey was conducted of both SFPUC treatment plants that included a performance assessment, major unit process evaluation and the identification of performance limiting factors along with possible corrective actions. This paper discusses SFPUC's approach to and findings of the survey.
File Size : 1 file
ISBN(s) : 0898679583
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 15
Published : 01/01/1997

History


Related products

AWWA QTC97209
Published Date: 01/01/1997
Evaluating the Benefits of a Reliable Groundwater System
7.20 €
AWWA QTC97196
Published Date: 01/01/1997
Examination of Corrosion Control Treatment Options at a North Jersey Facility
7.20 €
AWWA QTC97193
Published Date: 01/01/1997
Application of a Bench Scale BDOC Column Method to Full Scale Plant Conditions
7.20 €
AWWA QTC97154
Published Date: 01/01/1997
Development of an Enhanced Water Quality Monitoring Program for Coliform Control
7.20 €

Best-Selling Products

DOT 23 CFR PART 625
Published Date: 04/01/2020
DESIGN STANDARDS FOR HIGHWAYS
9.00 €
DOT 23 CFR PART 645
Published Date: 04/01/2019
UTILITIES
10.80 €
DOT 23 CFR PART 655
Published Date: 04/01/2018
TRAFFIC OPERATIONS
9.30 €
DOT 33 CFR PART 127
Published Date: 07/01/2019
WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS
11.70 €
DOT 33 CFR PART 154
Published Date: 07/01/2017
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
18.30 €
DOT 33 CFR PART 154
Published Date: 07/01/2019
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
18.30 €