AWWA WQTC50505 PDF

AWWA WQTC50505 PDF

Name:
AWWA WQTC50505 PDF

Published Date:
01/01/1999

Status:
Active

Description:

Optimization of C. parvum Inactivation With Ozone/Free Chlorine and Ozone/Monochloramine

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The objective of this study was to investigate the synergy involved in ozone/free chlorine and ozone/monochloramine sequential disinfection schemes. The ozone/free chlorine disinfection scheme was reported previously; thus, the main focus of this paper is the ozone/monochloramine sequential disinfection scheme. In this study, monochloramine was formed with approximately 6.4 mg/L as N excess ammonia; thus, the effect of ammonia after pretreatment with ozone was also investigated. Oocyst viability was determined by a modified in-vitro excystation method that is consistent with animal infectivity data. Includes 15 references, figures.
Edition : Vol. - No.
File Size : 1 file , 210 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 01/01/1999

History


Related products

AWWA WQTC50348
Published Date: 01/01/1999
Ultra Low Range Instrument Increases Turbidimetric Sensitivity by Two Orders of Magnitude
$7.2
AWWA WQTC50489
Published Date: 01/01/1999
Biological Manganese Removal for a 26 mgd Water Treatment Plant
$7.2
AWWA WQTC50487
Published Date: 01/01/1999
Colored Groundwater Treatment With Ozone and Biologically-Active Filtration
$7.2
AWWA WQTC50420
Published Date: 01/01/1999
How to Balance Disinfection and Disinfection By-product Goals When Starting Up Major Distribution System Expansions
$7.2

Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
$160.5
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
$364.5
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
$274.5
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
$157.5
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
$104.7
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
$104.7