AWWA WQTC52880 PDF

AWWA WQTC52880 PDF

Name:
AWWA WQTC52880 PDF

Published Date:
01/01/2000

Status:
Active

Description:

Integration of Lime Softening and Ultrafiltration: A Powerful Water Quality Combination

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Marco Island is located in Collier County, on the southwest coast of Florida. InMay, 2000, the Marco Island Lime Softening Water Treatment Plant (LSWTP) wasexpanded from 5.0 to 6.67 million gallons per day (mgd) with the addition of a1.67 mgd immersed membrane ultrafiltration (UF) demonstration unit. This papersummarizes the results of the UF project that was implemented to evaluate theviability of a UF membrane process as a polishing step to conventional limesoftening treatment of hard and highly natural organic and colored surfacewater supplies. Includes 9 references, tables, figure.
Edition : Vol. - No.
File Size : 1 file , 280 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 01/01/2000

History


Related products

AWWA WQTC52806
Published Date: 01/01/2000
Turbidity Monitoring and Compliance for the Interim Enhanced Surface Water Treatment Rule
$7.2
AWWA WQTC52997
Published Date: 01/01/2000
Cryptosporidium and Microsphere Removal During Low Turbidity End-of-Run and Early Breakthrough Filtration
$7.2
AWWA WQTC52994
Published Date: 01/01/2000
Optimizing Cryptosporidium Inactivation Credit With Ozone at Las Vegas Using the Integrated Disinfection Design Framework
$7.2
AWWA WQTC52987
Published Date: 01/01/2000
Treatment of Cyanotoxins in Drinking Water Using Ozone
$7.2

Best-Selling Products

UNE-CLC/TS 50131-2-2:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-2: Requirements for passive infrared detectors
UNE-CLC/TS 50131-2-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-3: Requirements for microwave detectors
UNE-CLC/TS 50131-2-4:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-4: Requirements for combined passive infrared and microwave detectors
UNE-CLC/TS 50131-2-5:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-5: Requirements for combined passive infrared and ultrasonic detectors
UNE-CLC/TS 50131-2-6:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-6: Requirements for opening contacts (magnetic)
UNE-CLC/TS 50131-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 3: Control and indicating equipment