AWWA WQTC60628 PDF

AWWA WQTC60628 PDF

Name:
AWWA WQTC60628 PDF

Published Date:
11/15/2004

Status:
Active

Description:

Arsenic Rule Compliance for Midland, Texas

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines information on arsenic rule compliance for Midland, Texas. Topics covered include: City of Midland sources of water supply; arsenic concentrations for the Paul Davis and McMillan Well Fields; Midland groundwater system flow schematic; groundwater arsenic summary; Arsenic Rule compliance strategies include treatment avoidance and water treatment for arsenic reduction; treatment avoidance alternatives that include alternative water source, blending, seasonal use, and blending and seasonal use; schematic diagram for possible arsenic rule compliance - blending and seasonal use; surface water arsenic concentrations; treatment for arsenic reduction; arsenic decision tree; arsenic treatment and residuals handling capital and operational costs; consideration of conventional treatment for arsenic reduction; advantages of using conventional treatment for arsenic reduction; capital cost comparison of treatment alternatives; revised Arsenic Rule compliance recommendations; and, groundwater arsenic reduction pilot testing.
Edition : Vol. - No.
File Size : 1 file , 400 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 11/15/2004

History


Related products

AWWA WQTC60645
Published Date: 11/15/2004
Verifying the Reliability of EPA Method 314 to Measure Perchlorate at Sub ppb Levels vs New EPA Method Options
$7.2
AWWA WQTC60669
Published Date: 11/15/2004
First High-Rate DAF in US - First Year of Operation
$7.2
AWWA WQTC60671
Published Date: 11/15/2004
Aesthetics as an Emerging Water Quality Issue: Need for T&O Testing of Distribution and Plumbing Materials
$7.2
AWWA WQTC60690
Published Date: 11/15/2004
Operational Planning and Implementation Considerations for the San Francisco Chloramine Conversion
$7.2

Best-Selling Products

JIS A 0005:1966
Published Date: 01/01/1966
Standard nominal size of opening components for buildings
$25.5
JIS A 0007:1967
Published Date: 01/01/1967
Standard nominal size of steel framed wall component for buildings
$14.1
JIS A 0008:1967
Published Date: 01/01/1967
Standard nominal size of steel framed roof component for buildings
$11.7
JIS A 0012:1980
Published Date: 01/01/1980
Modular co-ordination -- Sizes of sanitary unit for dwellings
$15.3
JIS A 0015:1976
Published Date: 01/01/1976
Modular co-ordinating sizes of piping unit for dwellings
$12.9
JIS A 0016:1979
Published Date: 01/01/1979
Modular coordination-coordinating size of opening for built-in appliances in storage furniture
$19.2