AWWA WSC61387 PDF

AWWA WSC61387 PDF

Name:
AWWA WSC61387 PDF

Published Date:
04/10/2005

Status:
Active

Description:

A Tale of Two Cities Part I: Lincoln, Nebraska

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper presents a case study in implementing security improvements that are performance-based and specifically adapted to the needs of a particular city, namely Lincoln, Nebraska. The case study includes discussion of those factors that all utilities face, from the type of field conditions, to the staff, and the political and governmental conditions this public agency had to consider. This paper demonstrates how to transition from a vulnerability assessment, to a planning process, to a procurement process for selecting vendors, and finally to implementation of a security program with changes in technology, training, procedures, testing, and staff changes to make the program work. The Lincoln Water System (LWS) had quickly developed recognition for the need to change to become more secure, but was not prepared to develop its program alone. The utility made a conscious decision to turn over the responsibility to EMA to lead the vulnerability assessment, followed by planning, construction, and implementation of security measures from start to finish. At every step, Lincoln challenged each feature to verify need and application to their system, but they were not as familiar with the techniques and capabilities of technology and organizational improvements that would be needed to achieve the desired level of performance. EMA and Lincoln recognized the need to take initial steps with a pilot project to evaluate the best equipment, systems, procedures, protocols, and organizational improvements available to protect the water system from threats. Results from the pilot could then be applied to design a fullscale set of improvements for all LWS facilities. Includes figure.
Edition : Vol. - No.
File Size : 1 file , 250 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 6
Published : 04/10/2005

History


Related products

AWWA WSC61373
Published Date: 04/10/2005
Responding to Homeland Security Presidential Directive 9 (HSPD 9): Water Sentinel System Architecture Overview
$7.2
AWWA WSC61379
Published Date: 04/10/2005
The California Health Alert Network (CAHAN) and Water System Partner Emergency Communication
$7.2
AWWA WSC61384
Published Date: 04/10/2005
A Tale of Two Cities Part I: Seattle, Washington
$7.2
AWWA WSC61389
Published Date: 04/10/2005
Information System Vulnerability: Integration of Remote Monitoring, Network Modeling and Management
$7.2

Best-Selling Products

prNS 2964
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polyethylene (PE) for underground non-pressure systems for drainage and sewerage
prNS 2965
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polypropylene (PP) for underground non-pressure systems for drainage and sewerage
prNS 2966
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of unplasticised poly(vinyl chloride) (PVC-U) for underground non-pressure systems for drainage and sewerage
prNS 2967
Published Date: 06/01/2001
Cable ducts of plastics with smooth solid wall pipe
prNS 2970
Published Date: 09/06/2004
Solid Wall cable ducting of thermoplastics for embedding
prNS 3563
Published Date: 07/01/2002
Ventilation for buildings - Design methodes for indoor climate